Savannah Harbor Comprehensive Study, Feasibility Report

Savannah Harbor Comprehensive Study, Feasibility Report

4.11 - 1251 ratings - Source



Plan 1-42 would result in a maximum increase in salinity of 0 - .99 ppt above US 17 and 0 - 1.83 below US 17 at flows of 6, 000 cfs. At flows ... Plan 1-42 assumes that all maintenance dredging for the present 38 foot channel would be completed prior to the new work dredging, ... upstream of the Fig Island Turning Basin, problems could arise with safety in the harbor and disruptions to shipping schedules.


Title:Savannah Harbor Comprehensive Study, Feasibility Report
Author:
Publisher: - 1991
ISBN-13:

You must register with us as either a Registered User before you can Download this Book. You'll be greeted by a simple sign-up page.

Once you have finished the sign-up process, you will be redirected to your download Book page.

How it works:
  • 1. Register a free 1 month Trial Account.
  • 2. Download as many books as you like (Personal use)
  • 3. Cancel the membership at any time if not satisfied.


Click button below to register and download Ebook
Privacy Policy | Contact | DMCA